The construction industry faced two major events last year, Real Estate Regulation & Development Act (RERA) and Goods and Services Tax (GST), both these events have forced the industry to become more transparent and process driven. RERA’s main objective is to regulate the unregulated sector and bring in more discipline to check the project delays and unfulfilled promises from developers. And, GST aims to rationalize the tax structure and bring in uniformity in prices, which is expected to profit both the developers and the home buyers.

Apart from the effects of this series of policy changes, the industry has always faced serious and chronic problems. Together, these policy changes and challenges have been limiting the growth prospects of the construction industry in India.

Source

1. Time Overrun

In India, on-time completion of construction projects happens rarely, in fact, time overrun in this industry is a universal problem. Time delays can occur due to many reasons:

  • Problems Of Financing
  • Payment For Completed Works
  • Poor Contract Management
  • Changes In Site Conditions
  • Shortage Of Materials
  • Design Changes
  • Weather Condition
  • And Many More

With the implementation of RERA, on-time completion of the project is a basic requirement, failing which builders will have to bear the penalties.

Source

2. Cost Overrun

One of the major considerations throughout the lifecycle of a building project is – COST. But, unfortunately, almost all the projects fail to achieve project completion with the projected cost. The various factors that contribute to cost overrun are:

  • Lack Of Contractor’s Experience
  • Poor Site Management And Supervision
  • Inaccurate Time And Cost Estimates
  • Schedule Delay
  • Frequent Design Changes
  • Fluctuation In The Prices Of Materials
  • Financial Difficulties Faced By Contractors

In addition to time overrun, cost overrun is another really serious problem in the construction industry in India and even worldwide.

Source

3. Construction Waste

Waste has a direct effect on the productivity, material loss and overall completion time of a project. It can also result in the loss of a significant amount of revenues. Construction wastes are generated due to one or more of the below reasons:

  • Frequent Design Changes
  • Poor Quality Of Materials
  • Workers’ Blunders During Construction
  • Poor Planning
  • Poor Site Management

Illegal dumping is another issue which has resulted out of increased construction waste generation and it has been causing risk to human health and the environment.

Source

4. Negative Impacts To The Environment

Construction’s built environment is believed to be the most environmentally unfriendly human activity. This is because it consumes huge amounts of natural resources and is a major source of urban air pollutants. Also, the emission of CO2 by buildings backs global warming and extreme weather change across the globe. In addition to these, ongoing harvesting of timber leads to the loss of natural forests.

Apart from these significant impacts, few other impacts of constructing a new building include excavating to provide aggregates, manufacture of cement, the inefficient use of water and the extensive use of toxic chemicals in construction materials.

The impact of the construction industry is extensive and is readily identifiable, but even then, most people aren’t stern on environmental protection in construction sites.

Source

5. Excessive Resource Consumption

Construction also has a weighty impact on natural resources, it accounts for one-quarter of its wood harvest, two-fifths of its energy and material flows, and one-sixth of the world’s freshwater extractions. The building structures alone also impact the areas beyond their direct location, disturbing watersheds, transportation patterns, and air quality.

Excessive resource and energy use and a growing demand for raw materials and water are mostly responsible for the depletion of natural resources worldwide and the hastening of global warming.

Shortage Of Sand & Water – The Most Alarming Challenge

Now that we know how the construction industry is plagued with challenges; considering that pool, the most alarming one is the shortage of natural resources like water and sand which further contributes to issues like, time overrun and cost overrun.

Wienerberger introduces Porotherm DryFix.System, a revolutionary system which can significantly reduce the consumption of water and sand during masonry construction. This innovative system improves productivity, saves costs and paves the way for the faster building of walls. Bearing in mind the rapidly increasing volume of construction in the urban areas, saving water in the pre-construction stages can provide huge relief to the city’s water crisis. Porotherm DryFix.System is a quick fix system which totally replaces the conventional masonry practices, resulting in dramatic water savings for any type of wall construction, i.e. infill masonry, partition walls or external walls. The system also totally eliminates the requirement for curing, consequently leading to water savings.

Benefits of Porotherm Dryfix.System

  • Ready to use, mason friendly and easy to transport
  • Fastest available masonry system
  • Clean & dry construction – No Debris
  • No need for chasing or curing
  • Strong & reliable adhesive bond
  • Zero site wastage
  • Next construction activity can begin within 24 hours
  • Enhances thermal protection
  • Minimal water usage
  • Improved quality construction

Read More About Porotherm Dryfix.System

The bottom line, Dryfix addresses all the issues of policy changes, time overrun, cost overrun, waste generation, negative impacts to the environment and excessive resource consumption quite well.

Towards Sustainable Construction

Creating a healthy built environment by using resource-efficient and ecologically-based principles is the need of the hour.  Sustainable construction involves a commitment to:

  • Economic Sustainability – Growing profitability by making more efficient use of resources, i.e. Water, Energy, Materials, and Labour.
  • Environmental Sustainability – Careful use of natural resources and minimizing waste to prevent harmful and potentially irreversible effects on the environment wherever possible.
  • Social Sustainability – Actively responding to the needs of people during any phase of the construction process (from commissioning to demolition). Aiming to provide high customer satisfaction, and working closely with local communities, clients, suppliers, and employees.

Again, sustainability is one dynamic concept and to achieve it the decision makers need to balance well all these three principles together.

Related Posts

Architecture /

Jali Architecture – 7 Exceptional Examples In India | Go Smart Bricks

Architecture /

Urban Heat Island – 7 Things You Should Know | Go Smart Bricks

Architecture /

“Architecture Must Be Region Specific”: An Interview with Meghna Srivastava | Go Smart Bricks

‹ Swach Bharat Archives – Go Smart Bricks › Green Garden: Project Carte Blanche – Go Smart Bricks

Recent Posts

  • Jali Architecture – 7 Exceptional Examples In India | Go Smart Bricks
  • Urban Heat Island – 7 Things You Should Know | Go Smart Bricks
  • “Architecture Must Be Region Specific”: An Interview with Meghna Srivastava | Go Smart Bricks
  • We Compare The Benefits Of Porotherm Bricks With Traditional Materials | Go Smart Bricks
  • 5 Renowned Architects From Bangalore | Go Smart Bricks

Recent Comments

No comments to show.

Archives

  • December 2025
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • February 2024
  • December 2023
  • May 2023
  • March 2023
  • May 2022
  • May 2021
  • April 2021
  • March 2021
  • October 2020
  • June 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • April 2019
  • March 2019
  • February 2019
  • December 2018
  • November 2018
  • August 2018
  • June 2018
  • May 2018
  • February 2018
  • December 2017
  • November 2017
  • October 2017
  • August 2017
  • July 2017
  • June 2017
  • May 2017
  • April 2017
  • March 2017
  • February 2017
  • November 2016
  • October 2016
  • July 2016
  • June 2016
  • April 2016
  • March 2016
  • January 2016
  • December 2015
  • November 2015
  • October 2015
  • September 2015
  • August 2015
  • July 2015
  • June 2015
  • May 2015

Categories

  • Architecture

Back to Top

© copyandpastefont.com 2026
Powered by WordPress • Themify WordPress Themes